The site of the ‘Verde’ office complex acts as a key point between the historical center and the new development area. The fundamental urban planning and architectural idea of ‘Verde’ is to integrate these territories as closely as possible, offering green corridor solutions along with principles of openness and transparency. This concept is realised by elevating the office buildings above a green and well-arranged public entrance floor. The unique geometry of the site and dynamic situation inspired the composition of the rolled building masses.
Client: "Hanza 14" Ltd
Address or location:
Roberta Hirsa street 1, Riga
Commissioning:
2022. gada jūlijs, 2024. gada aprīlis
Technical information:
40 418 m2
Builder:
1st stage - July 2022, 2nd stage - April 2024
Partners:
1st stage - "VELVE" Ltd, 2nd stage - "Capitalica Industries LV" Ltd
Author of photos:
"Arenso" (Matīss Apsītis, Māris Pelšs). AVK, UK - "Berga projekti" (Jānis Bergs, Zigmārs Dambenieks, Matīss Grietēns), EL, ESS - "A. Ābeles engineering office" (Armands Ābele, Vadims Litvinskis, Uldis Schulcs, Antra Gaidukas, Grigorijs Macāns, Valerijs Hramovs, Natalia Smirnova), fire protection system "VPM Latvija" (Agnis Boitmanis, Valentīna Korotkova, Edmunds Eižvertiņš, Ārik Beinarovičs, Vitalijs Oleščuks), construction work organization - "DOP projects" (Yurijs Akimovs, Irina Čeniša), TS-CD - "Tomuss" (Andrejs Piesis), energy efficiency - Andris Vulāns, UKT - "Comfort standard" (Iveta Ruža)




